<div dir="ltr"><div>Dear QE users and developers,</div><div><br></div><div>I was doing a scf calculations for a metal-organic frame work system by using hybrid HSE functional. The calculation get stopped and exit after doing the first scf step. I used norm-conserving PBE pseudopotential for the calculation. I tried with qe-5.4.0 and qe-6.0 version but encounter the same problem.  I use 16 nodes and each node has 16 proc . I also tried with GAU-PBE but faced the same problem as HSE again. I do not understand what could be the issue with the hybrid functional. I could not able to send my case.out file below as it exceeded the size limit. I have put some part of out put file below where the job stops. Any suggestions regarding the above issue would be highly appreciated. </div><div><br></div><div><div><br></div><div>     the Fermi energy is     2.8699 ev</div><div><br></div><div>!    total energy              =   -1465.57554964 Ry</div><div>     Harris-Foulkes estimate   =   -1465.57571118 Ry</div><div>     estimated scf accuracy    <       0.00040618 Ry</div><div><br></div><div>     total magnetization       =    -8.00 Bohr mag/cell</div><div>     absolute magnetization    =    12.10 Bohr mag/cell</div><div><br></div><div>     convergence has been achieved in  12 iterations</div><div>APPLICATION TERMINATED WITH THE EXIT STRING: Killed (signal 9)</div></div><div><br></div><div><div class="gmail_signature"><div dir="ltr">Paresh Chandra Rout<div>Research Scholar</div><div>Indian Institute of Science Education and Research Bhopal</div><div>India </div></div></div></div>
</div>