When calculate DOS, you should make a scf calculation first, then nscf, last is bands and dos.<br><br><div class="gmail_quote">2012/9/19 Davide Tiana <span dir="ltr"><<a href="mailto:d.tiana@bath.ac.uk" target="_blank">d.tiana@bath.ac.uk</a>></span><br>
<blockquote class="gmail_quote" style="margin:0 0 0 .8ex;border-left:1px #ccc solid;padding-left:1ex">Dear all,<br>
I am trying to calculate DOS and projected DOS for a semiconducting 1D<br>
hybrid (i.e. metal-organic) polymer. The band gap I found is about<br>
0.4. However when I try to calculate DOS I don't find 0 contribution<br>
at the Fermi level nor a band gap around it. I am in doubt and I think<br>
something wrong happened (namely I made some errors). How can I check<br>
that everything is fine and-or explain this behaviour?<br>
<br>
By the way here what I've done:<br>
<br>
pw optimisation<br>
pw band calculation<br>
pw nscf calculation<br>
dos dos calculation (at first instance I did't make but finding<br>
something "weird" in the total projwfc I run it to check)<br>
projwfc projected dos calc<br>
<br>
thanks a lot<br>
<br>
_______________________________________________<br>
Pw_forum mailing list<br>
<a href="mailto:Pw_forum@pwscf.org">Pw_forum@pwscf.org</a><br>
<a href="http://www.democritos.it/mailman/listinfo/pw_forum" target="_blank">http://www.democritos.it/mailman/listinfo/pw_forum</a><br>
</blockquote></div><br><br clear="all"><div><br></div>-- <br>----<div>Yue-Wen Fang</div><div><br></div><div><br></div><br>